Case Studies
LNG STORAGE TANK, KOCHI
• Client : LNG Petronate
• Supervisor consultant : M/s WESSO
• EPC contractor : M/s IHI, Japan
• Civil Contractor : Afcons Infrastructure Ltd.
There are two tanks of 80 mm diameter and 48 mtr. height. Total quantum of Post tensioning involved 1200 MT which includes vertical cable and semi circular horizontal cables of 160 mtr length