• FPCC Completed Bangalore Metro project in just 8 months
• Length of corridor was 1500m
• 37 Spans has been used in this project
• FPCC used 19K15 Prestressing System
• FPCC has used 275 MT High tension strands
• Project Status is in Progress
Case Studies
Projects: Bangalore Metro
Details: This bridge is located in Bangalore. The total length of flyover was 1.5k.m..The total number of segments was 584 nos and duration was 8 months. The 19K15 system was used.