prestressing_completed

Beas Bridge

Key Facts

• FPCC Completed Beas Bridge project in just 6 months.

• Length of corridor was 200m.

• FPCC used 12K13 Prestressing System.

• Project Status is completed.

 

 

Case Studies

Project: Beas Bridge,Kullu , Himachal Pradesh


Details:  Beas project was constructed across river Kullu in Himachal Pradesh. Due to heavy current of water and geological condition, typical arch of 100 mtr span was constructed to support the deck and columns of the bridge.

 

The FPCCL was involved in carrying out the erection and its analysis of arch. The arch was constructed in the segment and alignment was maintained / adjusted using temporary stays which were anchored in temporary steel towers.